Tiemeyer Off-Channel Pond
|
Columbia Pacific RC&EDD; Tiemeyer Off-Channel Pond (#00-1869)
04/17/2003, Attachment #5398, Sponsor Photo
|
|
|
|
|     Funding |
  |
|
|
|     Links |
|
|   |
|
|
The Tiemeyer Off-Channel pond project will improve the habitat and access for salmonid juveniles coho, steelhead & cutthroat for overwintering and summer rearing. the site is a 3,421 ft long wetland area off channel habitat.
The project is located in Jefferson Co., near the town of Clearwater. The site is in section 18, T24N R12W, WRIA 21.0024, 70 miles north of Hoquiam, WA. 3.5 miles from the confluence of the Clearwater River, where it meets the Queets River 5 miles from the Pacific Ocean.
The limiting factors include low dissolved oxygen levels, temperature, cover, and limited access to upper wetlands. The scope of work involves the restoration of wetlands by removing cedar spaults that constrict water flow through the channel. An excavator will be used to pull back the waste above the ordinary high water line. Removal of clay/silts and cedar waste will increase the pond depth, improving water quality, water quantity, and habitat for salmonids.
The pond edge will be lined with Typar fabric or bentonite to seal the pond and covered with soils. Revegetation with native plants will complete the project. The plants around the pond will provide bank stablilization and cover to regulate water temperature. Construction of a cedar plank control structure will be used to maintain and increase water depth throughout the wetland. The off channel habitat for salmonids will be increased significantly by providing access to one acre of additional wetland upstream of the project site.
|
|
General Area:
|
|
located in Jefferson Co., near the town of Clearwater. The site is in section 18, T24N R12W, WRIA 21.0024, 70 miles north of Hoquiam, WA. 3.5 miles from the confluence of the Clearwater River, where it meets the Queets River 5 miles from the Pacific Ocean
|
|
Waterbody:
|
|
Clearwater River, Hurst Creek
|
|
County:
|
|
Jefferson
|
|
Legislative District:
|
|
24
|
|
Congressional District 2022:
|
|
06
|
|
Salmon Recovery Regions:
|
|
Washington Coast
|
|
Watershed Administrative Unit:
|
|
Lower Clearwater
|
|
HUC8:
|
|
Queets-Quinault (17100102)
|
|
WRIA:
|
|
Queets - Quinault
|
|
Sections:
|
|
18
|
|
Township:
|
|
T24NR12W
|
|
Coordinates:
|
|
47.58403552 -124.28226447
|
|
|
| Worksite Name | Scope of Work | Actual Restoration Cost |
|
Tiemeyer Off-Channel Pond (#1)
|
Architectural & Engineering (A&E), Channel reconfiguration and connectivity (C.4.c.1), Channel structure placement (C.4.d.1), Fish passage blockages removed or altered (C.2.c.1), Implementation monitoring, Obtain permits, Planting (C.5.c.1), Wetland improvement/ restoration (C.8.e.1)
|
$45,383
|
| | Total | $45,383 |
Amounts may not be complete
| Worksite Name | | Property Name | Landowner Type |
|
Tiemeyer Off-Channel Pond (#1)
|
|
Property 1 - Property - Worksite #1
|
Private
|
| | | | Total |
Amounts may not be complete
| | Category / Work Type / Metric | Final |
Restoration Metrics (rolled up from Worksite level) |
Fish Passage Improvement |
| Fish passage blockages removed or altered (C.2.c.1) |
|
|
Number of Blockages/Impediments/Barriers Removed/Altered (C.2.c.2)
|
1
|
Instream Habitat Project |
| Channel reconfiguration and connectivity (C.4.c.1) |
|
|
Miles of Stream Treated for channel reconfiguration and connectivity (C.4.c.3)
|
0.35
|
|
|
Miles of Off-Channel Stream Created or Connected (C.4.c.4)
|
0.10
|
|
|
Acres Of Channel/Off-Channel Connected Or Added (C.4.c.5)
|
0.3
|
|
|
Instream Pools Created/Added (C.4.c.6)
|
5
|
| Channel structure placement (C.4.d.1) |
|
|
Miles of Stream Treated for channel structure placement (C.4.d.3)
|
0.35
|
|
|
Acres Of Streambed Treated for channel structure placement (C.4.d.4)
|
0.3
|
|
|
Number of structures placed in channel (C.4.d.7)
|
7
|
Riparian Habitat Project |
| Planting (C.5.c.1) |
|
|
Acres Planted in riparian (C.5.c.3)
|
0.2
|
Wetland Project |
| Wetland improvement/ restoration (C.8.e.1) |
|
|
Acres of wetland Improved/Restored (C.8.e.2)
|
0.3
|
Fish Passage Improvement |
| |
|
|
Number of blockages / impediments / barriers impeding passage (C.2.b.4)
|
1
|
| Milestone Name | Target Date | Description |
|
Project Start
|
04/01/2001
|
Survey/Design
|
|
Monitoring Started
|
04/01/2001
|
Quinault Nation Smolt Out Migration Monitoring/Tagging
|
|
Applied for Permits
|
04/15/2001
|
JARPA Permit for HPA
|
|
A&E Plans Submitted
|
04/15/2001
|
Project Design for Permit
|
|
Bid Awarded/Consultant Hired
|
05/01/2001
|
Possible Consultant for Surveying/Design
|
|
Construction Started
|
06/15/2001
|
Depending on Weather could be in August for Heavy Equipment
|
|
Construction Complete
|
06/01/2002
|
Additional Planting if required
|
|
Monitoring Complete
|
06/01/2002
|
|
|
Agreement End Date
|
03/31/2003
|
|
|
Final Docs/Billing to Mgmt Agy
|
03/31/2003
|
|