    Project Details    
Project Status:  Board Alternate since 01/16/2024
 
Project Type:  Restoration
Project Sponsor:  Snohomish County Surface Water Management
Funding Board:  Salmon Recovery Funding Board
              Funding  
PSAR Large Capital Projects: $5,433,225
Total RCO Grant: $5,433,225 (100%)
Total Agreement: $5,433,225 (100%)
              Links
 

    Project Description    
Snohomish County’s Surface Water Management Division will use this grant to remove large portions of a levee, connect side channels, improve river edge habitat, place large woody materials in the river, and plant the banks of Thomas' Eddy in the Snohomish River. Adding woody materials such as logs and tree root wads to a river creates places for fish to rest, feed, and hide from predators. It also slows the water, which reduces erosion and allows small rocks to settle to the bottom, creating areas for salmon to spawn. Finally, it changes the flow of the water, creating riffles and pools, which give salmon more varied habitat. Planting trees and bushes along a river shades the water, keeping it cool for fish. The plants also drop branches and leaves into the water, which provide food for the insects that salmon eat. Finally, the roots of the plants keep soil from entering the water, where it can smother fish spawning gravel. The work will improve the quality and quantity of habitat and connectivity between the river, floodplain, and tributaries. The work will be done in the Bob Heirman Wildlife Preserve. The 1930s, levee construction isolated more than 200 acres of Snohomish River floodplain including about 1.5 miles of off- and side-channel habitat and added nearly a mile of modified and rip-rapped edge to the river. The river is used by Chinook salmon and steelhead trout, which are species listed as "threatened" with extinction under the federal Endangered Species Act; by coho salmon, which is a federal species of concern; and by chum and pink salmon. This grant is from the Puget Sound Acquisition and Restoration fund.

    Project Contacts    
         
Project Sponsor: Snohomish County Surface Water Management Lead Entity: Snohomish Basin Lead Entity
  Project Contact: Michael Rustay
mike.rustay@snoco.org
(425) 262-2627
   
 
Funding Agency: Recreation and Conservation Office    
  Project Manager: Sandy Dotts
sandra.dotts@rco.wa.gov
(360) 628-9487
   

    Project Location    
County:   Snohomish
Legislative District:   44
Congressional District 2022:   01
Salmon Recovery Regions:   Puget Sound
Watershed Administrative Unit:   Everett
HUC8:   Snohomish (17110011)
WRIA:   Snohomish
Sections:   31
Township:   T28NR06E
Coordinates:   47.86249129
-122.08676794

    Worksites    
Worksite NameScope of WorkProposed Restoration Cost
Thomas' Eddy (#1) Architectural & Engineering (A&E), Channel reconfiguration and connectivity (C.4.c.1), Channel structure placement (C.4.d.1), Cultural resources, Obtain permits, Planting (C.5.c.1), Riparian Plant removal / control (C.5.h.1) $5,433,225
 Total$5,433,225
Amounts may not be complete

    Properties    
Worksite Name Property NameLandowner Type
Thomas' Eddy (#1)   Property 1 - Thomas' Eddy Local Government
   Total
Amounts may not be complete

    Project Metrics (Outcomes, Benefits)    
 Category / Work Type / MetricEstimated

Restoration Metrics (rolled up from Worksite level)

Instream Habitat Project
      Channel reconfiguration and connectivity (C.4.c.1)
Miles of Stream Treated for channel reconfiguration and connectivity (C.4.c.3) 0.30
Miles of Off-Channel Stream Created or Connected (C.4.c.4) 1.49
Acres Of Channel/Off-Channel Connected Or Added (C.4.c.5) 202.7
      Channel structure placement (C.4.d.1)
Miles of Stream Treated for channel structure placement (C.4.d.3) 0.47
Pools Created through channel structure placement (C.4.d.5) 12
Number of structures placed in channel (C.4.d.7) 39

Riparian Habitat Project
      Planting (C.5.c.1)
Acres Planted in riparian (C.5.c.3) 50.0
      Riparian Plant removal / control (C.5.h.1)
Acres of riparian treated for plant removal/control (C.5.h.3) 30.0

Permits
      Obtain permits
Number of permits required for implementation of project 11

Riparian Habitat Project
      Planting (C.5.c.1)
Miles of streambank planted (C.5.c.4) 0.80
      Riparian Plant removal / control (C.5.h.1)
Miles of streambank treated for plant removal/control (C.5.h.4) 0.78
      Planting (C.5.c.1)
Average Riparian Width 150

    Project Permits    
Permit TypeApplied
Date
Received
Date
Expiration
Date
Permit Number
Water Quality Certification [Section 401]
Shoreline Permit
SEPA
Nationwide Permit
Hydraulics Project Approval [HPA]
Endangered Species Act Compliance [ESA]
Cultural Assessment [Section 106]
Clear & Grade Permit
Archaeological & Cultural Resources (EO 21-02)
Aquatic Lands Use Authorization

    Project Attachments    
Attachment TypeAttachment TitleAttach Date
Applicant Resolution/Authorizations ApplicantAuthorization_RCO Projects_signed.pdf.pdf 01/13/2022
Application Document Thomas'Eddy_PSAR-LargeCap_SuppQuestions.pdf.pdf 06/03/2022
Application Document Thomas'Eddy_SRFB-PSAR_LinkstoRelatedDocs.pdf.pdf 02/24/2022
Application Review Report Grant Manager Comments, 22-1033R(compl 07/21/22 08:52).pdf 07/21/2022
Application Review Report Grant Manager Comments, 22-1033R(rtnd 06/03/22 20:27).pdf 06/03/2022
Application Review Report Grant Manager Comments, 22-1033R(rtnd 04/01/22 13:39).pdf 04/01/2022
Cost Estimate Thomas'Eddy_PSAR-LargeCap_CostEstimate_Final.xlsx.xlsx 06/03/2022
Cost Estimate Thomas' Eddy_PSAR_Cost Estimate_FINAL.xlsx.xlsx 02/24/2022
Cultural Resource Screening Report Project Cultural Resource Screening Report (01/16/24 08:58:4.pdf 01/16/2024
Cultural Resource Screening Report Project Cultural Resource Screening Report (04/26/23 16:31:5.pdf 04/26/2023
Cultural Resource Screening Report Project Cultural Resource Screening Report (10/04/22 08:29:5.pdf 10/04/2022
Design document Thomas Eddy-60pct Preliminary Plans-2022-06-10-Rev1.pdf.pdf 06/14/2022
Design document Thomas Eddy Construction Cost Estimate 60%-Onsite-2022-06-10.xlsx 06/14/2022
Design document Thomas Eddy Construction Cost Estimate 60%-Offhaul-2022-06-1.xlsx 06/14/2022
Letters of Support Thomas'Eddy_PSAR-LargeCap_LE-LOS.pdf.pdf 06/03/2022
Map: Area of Potential Effect (APE) Project APE Report (01/16/24 08:58:48).pdf 01/16/2024
Map: Area of Potential Effect (APE) Project APE Report (04/26/23 16:31:51).pdf 04/26/2023
Map: Area of Potential Effect (APE) Project APE Report (10/04/22 08:34:34).pdf 10/04/2022
Map: Restoration Worksite Thomas'Eddy_RestorationConceptMap.pdf.pdf 02/24/2022
Photo Thomas' Eddy Salmon Presence Outside Levee in offchannel out.jpeg 02/25/2022
Photo Thomas' Eddy Reed Canarygrass Challenge.jpg.jpg 02/25/2022
Photo Thomas' Eddy Landscape Nov 15 2021 flood - 16.60ft at Monroe.jpg 02/25/2022
Photo Thomas' Eddy Beck Dike from River.jpg.jpg 02/25/2022
Photo Thomas' Eddy (middle) dike breach view from inside park.jpg.jpg 02/25/2022
Preliminary design report Thomas' Eddy-BDR-60pct-Final-2022-06-10_reduced.pdf.pdf 06/14/2022
Preliminary design report SnoCo_prelim design.docx.docx 03/01/2022
Project Application Report Project Application Report, 22-1033R (sub 01/16/24 08:58:47).pdf 01/16/2024
Project Application Report Project Application Report, 22-1033R (sub 06/24/22 13:29:32).pdf 06/24/2022
Project Application Report Project Application Report, 22-1033R (sub 06/03/22 17:09:41).pdf 06/03/2022
Project Application Report Project Application Report, 22-1033R (05/09/22 14:09:14).pdf 05/09/2022
Project Application Report Project Application Report, 22-1033R (sub 03/01/22 06:29:12).pdf 03/01/2022
Project Review Comments Proj Review Comments Final, 22-1033R(compl 01/16/24 08:58).pdf 01/16/2024
Project Review Comments Proj Review Comments Initial, 22-1033R(compl 01/16/24 08:58).pdf 01/16/2024
Project Review Comments Project Review Comments Report, 22-1033R (05/09/22 14:09:16).pdf 05/09/2022
Video 100YR-Proposed-Depth-RAS2D.mp4.mp4 06/14/2022
Video 2YR-Proposed-Depth-RAS2D.mp4.mp4 06/14/2022
Visuals SRFB_SiteTour_031622.pdf.pdf 04/26/2022
Visuals Thomas' Eddy Beck Dike Oblique.pdf.pdf 02/25/2022
Visuals Thomas'Eddy_VicinityMap.pdf.pdf 02/24/2022
Visuals Thomas'Eddy_VegPlanting_Concept.pdf.pdf 02/24/2022
Visuals Thomas'Eddy_LandscapeFeaturesMap.pdf.pdf 02/24/2022

Back to top Date of last change: 01/16/2024